Not a lot to say really, I’ve worked my way around the
ground floor of the building. The basic framework has been done and the
sections that are just wooden panels.
The other sections which will include
windows and the door will be done later.
This allows me to add on the pieces for the second floor.
Next article in this series: Mystery Model -Top Floor
No comments:
Post a Comment
Comments and suggestions are always welcome when they are related to the posts.
Comments are moderated to remove spam postings. Spam posting will NOT be tolerated.
Thanks DJK.